Er was een probleem met het laden van de reacties.

[24-04-25] Maintenance Tuxis Network

Support Portal  »  Announcements  »  Bekijkt artikel

  Printen

Urgency: Planned maintenance, 24-04-25 2300 - 25-04-25 0200 CET
Expected impact: low to none

 

During this maintenance we will increase redundancy in our new core network.
This will be done by connecting the spine switch on BIT-1 with BIT-2C.

 

This is the final step that needs to be done for the finalization of our new core network,
and it will be the start of the dismantling of the old core network.


Deel via
Is dit artikel zinvol?  

Gerelateerde artikelen

© Tuxis B.V.