There was a problem loading the comments.

[04-09-25] Network maintenance Maincubes

Support Portal  »  Announcements  »  Viewing Article

  Print

Urgency : Planned, 04-09-25 1000 - 1500 CEST
Expected impact: low to none

 

We will upgrade our switch in Maincubes to a 100G uplink so we are better prepared for future expansion on this location.

During this maintenance we will shutdown all BGP sessions to:

  • AMS-IX
  • Frys-IX
  • Speed-IX

All traffic that we would normally receive from these peering locations will be diverted through one of our 3 other transit partners.


Share via
Did you find this article useful?  

Related Articles

© Tuxis B.V.