Urgency : Planned,
Expected impact: low to none
We will upgrade our switch in Maincubes to a 100G uplink so we are better prepared for future expansion on this location.
During this maintenance we will shutdown all BGP sessions to:
All traffic that we would normally receive from these peering locations will be diverted through one of our 3 other transit partners.